http://www.monolithic.com/topics/domes
The Monolithic Dome
Cutaway David Collins
Schematic cutaway of the layers of the final Monolithic Dome.
Foundation
Airform
Polyurethane Foam
Steel rebar
Shotcrete
The Monolithic Dome
Cutaway David Collins
Schematic cutaway of the layers of the final Monolithic Dome.
Foundation
Airform
Polyurethane Foam
Steel rebar
Shotcrete
Nice layout of this blog!
ReplyDeleteIs there a way to reduce the waste of the concrete shotcrete due to rebound? How close can you get to the rebar when spraying?
Thanks, Joel
Hi Joel, not sure really. Seems to be many factors involved. But, I was able to find this article about ECC which might help: http://ace-mrl.engin.umich.edu/NewFiles/publications/2009/lpl-shotcreting.pdf
ReplyDelete